A Cut Above the Rest: Engineering Classroom and Research Building on Texas A&M University Galveston Campus Formally Opens
Ribbon Cutting Ceremony ushers in a new era for engineering and computer science education on Galveston Island

After a soft opening at the start of the Fall 2026 semester, the Engineering Classroom and Research Building (ECRB) at Texas A&M University’s Galveston Campus was officially opened during a ribbon cutting on October 30, 2026.
During the ceremony, Col. Mike Fossum, Chief Operating Officer, Texas A&M University at Galveston joked that, “Although we have had students in the building since August, with the cutting of this ribbon, I declare the ECRB to be officially open.”

Joining Fossum on the stage at the ribbon cutting were, Dr. Susan Ballabina, President, Texas A&M University, Dr. Robert Bishop, Vice Chancellor and Dean of Engineering, Texas A&M University, and Texas State Representatives Terri Leo Wilson and Dennis Paul.
The three-story, 54,000-square-foot, ECRB houses the Freshman Engineering Program, multiple four-year College of Engineering programs including Computer Science and Engineering (CSCE), Interdisciplinary Engineering (ITDE), Ocean Engineering (OCEN), as well as Texas A&M Galveston’s Marine Engineering Technology program.
“As one of a very small number of universities with the sea, land and space grant designations, engineering students at Texas A&M University are well positioned to learn the skills needed to address critical engineering shortages in maritime and beyond,” said Dr. Ballabina. “This new building on the Galveston campus will help us expand the mission of Texas A&M University.”
The ECRB provides a new home for engineering students while promoting growth opportunities for study. It features administrative offices and conference space, as well as active learning spaces to support engineering programs, research laboratory space for faculty-led research programs, group study collaboration areas, and a state-of-the-art technology maker space where students can design and develop physical prototypes for projects.
The maker space is comprised of numerous workstations for design and worktables with electricity and compressed air connections to allow inventive engineering minds to turn their drawings and ideas into working prototypes. In addition, the maker space provides storage areas for the projects, eliminating the need for students to carry their projects across campus.
Joining the maker space, the ECRB also features an aquatic lab with a water tank for students to conduct their research and experiments in a simulated marine environment. The types of experiments that the water lab will support include underwater robotics motion characteristics and control, propeller open water stationary thrust tests, and anything else that requires curiosity, water and ambition to explore.
“This new building will allow our students to come up with solutions to many issues facing marine and maritime environments,” said Dr. Robert Bishop, Vice Chancellor and Dean of Engineering, Texas A&M University. “There is a great need for autonomous vehicles, and this building will provide space for students to develop them. Additionally, the computer science program will address cybersecurity threats that are facing the maritime industry.”
Turner Construction Company was awarded a contract to build the ECRB. The ECRB was designed by Stantec (formerly Page). Construction on the building began in 2024. Final cost of the construction is around $52 million.
Initial funding for the building came from the Texas State Legislature in 2021. Col. Fossum noted that the initial request as well as a following request for additional funding were well received. Col. Fossum thanked Representatives Wilson and Paul for their steadfast support of not only the ECRB but the Galveston campus in general.

“Representative Wilson has been a longtime supporter of the campus and has been a tremendous help in opening up back doors to get us in front of the people we need to see,” Fossum said.
Representative Paul, who is running for Texas Senate, District 11, noted that as the only engineer in the Texas State Legislature, he has a particular fondness for supporting engineering programs.

The ECRB was envisioned and designed in partnership with Texas A&M University’s 25,000 students by 2025 Initiative. Additionally, the ECRB supports the Texas A&M University College of Engineering’s Entry to a Major (ETAM) process by allowing engineering students to either spend their first year studying on the Galveston campus before transferring to College Station or complete their entire engineering degree on the Galveston campus.
The ECRB is adjacent to the Powell Marine Engineering Complex (PMEC), which will continue to support all engineering/engineering technology programs with needed classroom, academic laboratory, research laboratory and administration space. Additionally, these programs will continue to leverage classroom space across the Galveston campus for needs over and above the space provided in PMEC and ECRB.
The ribbon cutting of the ECRB follows the September arrival of TS Lone Star State. The celebration of new facilities on the Galveston Campus of Texas A&M University will continue November 21 during a Homeport Celebration of the Lone Star State.
“Initial funding for the Lone Star State and the ECRB both came in 2021,” said Col. Fossum. “Five years later, they are both on campus helping prepare our students to succeed in all aspects of marine and maritime endeavors.”